HEFT ANFORDERN

Logo German Ports

Magazin für Häfen, Schifffahrt und Logistik

1.5 million euros for new lock technology

01.10.2022
BREMERHAVEN. A building was completed in the small fishing harbour lock in August, which will house the technical equipment for running the lock. The cost amounted to 1.5 million euros. The new build will store all the sensitive drive components and controls above the current valid level, in order to ensure operational safety even at higher water levels. Further construction works are already planned for 2023, notably the modernisation of the electromechanical drives on the lock head.

Credits: BERND LANGER

More articles from the category Community News

Ludwig-Plate-Straße closed until 30 October

Ludwig-Plate-Straße closed until 30 October

BREMEN. From 21 September, the level crossing on Ludwig-Plate-Straße will undergo extensive renovation. The works are expected to last until 30 October. During this period, Ludwig-Plate-Straße will be closed to private motorised traffic in the vicinity of the level crossing.

read more
Ludwig-Plate-Straße closed until 30 October

Ludwig-Plate-Straße closed until 30 October

BREMEN. From 21 September, the level crossing on Ludwig-Plate-Straße will undergo extensive renovation. The works are expected to last until 30 October. During this period, Ludwig-Plate-Straße will be closed to private motorised traffic in the vicinity of the level crossing.

read more
ZDS calls for reason and proportionality

ZDS calls for reason and proportionality

HAMBURG In light of the ballot launched by ver.di on indefinite strikes in German seaports, the Zentralverband der deutschen Seehafenbetriebe (ZDS) called for reason and proportionality on 17 September.

read more
Logo German Ports

Kontakt

Barrierefreiheit

Impressum

Datenschutzerklärung

Home

Logo German Ports
Home
Datenschutzerklärung
Impressum
Barrierefreiheit
Kontakt

2026