REQUEST THE MAGAZINE

Logo German Ports
Magazine for ports, shipping and logistics

Successful lock gate maintenance

06.11.2024
CUXHAVEN. After five months of intensive work, NPorts completed the maintenance work carried out on the central gate of the sea lock in Cuxhaven in October. Every six years, the port operator has to drain and thoroughly overhaul each of the three lock gates there. The costs involved are roughly 700,000 euros for each gate. These investments ensure that the structure can continue to fulfil its function reliably in the future. “The flooding of the gate is always an emotional moment,” explained Knut Kokkelink, head of the NPorts Cuxhaven site, as masses of water flowed out again for the first time.

Credits: NPorts

More articles from the category Community News

Dirks Group expands Emden Industrial Park

Dirks Group expands Emden Industrial Park

EMDEN. The Dirks Group is expanding its space for logistics projects at the Emden Industrial Park. According to the contract logistics provider, which has been operating there since 2005, it now has a total of 90,000 square metres of warehouse space on the site.

read more
NPorts presents new sustainability report

NPorts presents new sustainability report

OLDENBURG. In July 2026, NPorts published its 2026 sustainability report. This report documents developments from 2022 to 2024 and, using specific projects and comprehensive key performance indicators, illustrates how sustainability is being implemented in Lower Saxony’s ports.

read more
Dirks Group expands Emden Industrial Park

Dirks Group expands Emden Industrial Park

EMDEN. The Dirks Group is expanding its space for logistics projects at the Emden Industrial Park. According to the contract logistics provider, which has been operating there since 2005, it now has a total of 90,000 square metres of warehouse space on the site.

read more
NPorts presents new sustainability report

NPorts presents new sustainability report

OLDENBURG. In July 2026, NPorts published its 2026 sustainability report. This report documents developments from 2022 to 2024 and, using specific projects and comprehensive key performance indicators, illustrates how sustainability is being implemented in Lower Saxony’s ports.

read more
Cross-site collaboration on new dolphins

Cross-site collaboration on new dolphins

NORDERNEY / NORDDEICH. After six of the eight groups of wooden dolphins on the heavy-duty ramp at Norderney had reached the end of their service life, NPorts replaced them in July 2026 with eight freestanding steel-tube dolphins fitted with doughnut fenders.

read more