HEFT ANFORDERN

Logo German Ports

Magazin für Häfen, Schifffahrt und Logistik

Successful lock gate maintenance

06.11.2024
CUXHAVEN. After five months of intensive work, NPorts completed the maintenance work carried out on the central gate of the sea lock in Cuxhaven in October. Every six years, the port operator has to drain and thoroughly overhaul each of the three lock gates there. The costs involved are roughly 700,000 euros for each gate. These investments ensure that the structure can continue to fulfil its function reliably in the future. “The flooding of the gate is always an emotional moment,” explained Knut Kokkelink, head of the NPorts Cuxhaven site, as masses of water flowed out again for the first time.

Credits: NPorts

More articles from the category Community News

Ludwig-Plate-Straße closed until 30 October

Ludwig-Plate-Straße closed until 30 October

BREMEN. From 21 September, the level crossing on Ludwig-Plate-Straße will undergo extensive renovation. The works are expected to last until 30 October. During this period, Ludwig-Plate-Straße will be closed to private motorised traffic in the vicinity of the level crossing.

read more
Ludwig-Plate-Straße closed until 30 October

Ludwig-Plate-Straße closed until 30 October

BREMEN. From 21 September, the level crossing on Ludwig-Plate-Straße will undergo extensive renovation. The works are expected to last until 30 October. During this period, Ludwig-Plate-Straße will be closed to private motorised traffic in the vicinity of the level crossing.

read more
ZDS calls for reason and proportionality

ZDS calls for reason and proportionality

HAMBURG In light of the ballot launched by ver.di on indefinite strikes in German seaports, the Zentralverband der deutschen Seehafenbetriebe (ZDS) called for reason and proportionality on 17 September.

read more
Logo German Ports

Kontakt

Barrierefreiheit

Impressum

Datenschutzerklärung

Home

Logo German Ports
Home
Datenschutzerklärung
Impressum
Barrierefreiheit
Kontakt

2026