REQUEST THE MAGAZINE

Logo German Ports
Magazine for ports, shipping and logistics

500th offshore wind turbine from Cuxhaven

11.02.2021

CUXHAVEN. In November, the 500th nacelle for an offshore wind turbine was completed at Siemens Gamesa in Cuxhaven. This marked an important milestone for the plant, which opened in 2017 and began regular operations in 2018. Cuxhaven is part of the Siemens Gamesa production network together with the rotor blade production facility in Hull (UK) and the installation port in Esbjerg (Denmark). Together with 164 other SG 8.0-167 DDs, the 500th turbine was installed in the UK’s largest offshore wind farm, Hornsea 2.

Photo Credit: Siemens Gamesa

More articles from the category Community News

Kick-off for “DigiWeser”

Kick-off for “DigiWeser”

BREMERHAVEN. The “DigiWeser” project was officially launched in May 2026 with a kick-off meeting. The core of the initiative is the establishment of a shared digital platform as a testbed, enabling all key stakeholders to exchange information more effectively in future.

read more
Bremerhaven maintains its market position

Bremerhaven maintains its market position

BREMERHAVEN. A study by the Institute of Shipping Economics and Logistics (ISL), commissioned by bremenports, confirmed in May 2026 Bremerhaven’s central role in international container traffic.

read more
Kick-off for “DigiWeser”

Kick-off for “DigiWeser”

BREMERHAVEN. The “DigiWeser” project was officially launched in May 2026 with a kick-off meeting. The core of the initiative is the establishment of a shared digital platform as a testbed, enabling all key stakeholders to exchange information more effectively in future.

read more
Bremerhaven maintains its market position

Bremerhaven maintains its market position

BREMERHAVEN. A study by the Institute of Shipping Economics and Logistics (ISL), commissioned by bremenports, confirmed in May 2026 Bremerhaven’s central role in international container traffic.

read more