REQUEST THE MAGAZINE

Logo German Ports
Magazine for ports, shipping and logistics

500th offshore wind turbine from Cuxhaven

11.02.2021

CUXHAVEN. In November, the 500th nacelle for an offshore wind turbine was completed at Siemens Gamesa in Cuxhaven. This marked an important milestone for the plant, which opened in 2017 and began regular operations in 2018. Cuxhaven is part of the Siemens Gamesa production network together with the rotor blade production facility in Hull (UK) and the installation port in Esbjerg (Denmark). Together with 164 other SG 8.0-167 DDs, the 500th turbine was installed in the UK’s largest offshore wind farm, Hornsea 2.

Photo Credit: Siemens Gamesa

More articles from the category Community News

BLG holds its own in a challenging market environment

BLG holds its own in a challenging market environment

BREMEN The B.Group has “performed better than expected” in the 2025 financial year, despite difficult economic and geopolitical conditions. This was stated by Chief Executive Matthias Magnor at the 146th Annual General Meeting in June 2026.

read more
WISTA Germany elects Carolyn Köhler as President

WISTA Germany elects Carolyn Köhler as President

HAMBURG. At its annual general meeting in June 2026, WISTA Germany elected a new executive board. Five of the seven board positions were filled by new members. These included the position of President, to which Carolyn Köhler (Bernhard Schulte Shipmanagement) was elected as the successor to Cathrin Prikker (Top Glory Marine Service).

read more
BLG holds its own in a challenging market environment

BLG holds its own in a challenging market environment

BREMEN The B.Group has “performed better than expected” in the 2025 financial year, despite difficult economic and geopolitical conditions. This was stated by Chief Executive Matthias Magnor at the 146th Annual General Meeting in June 2026.

read more
WISTA Germany elects Carolyn Köhler as President

WISTA Germany elects Carolyn Köhler as President

HAMBURG. At its annual general meeting in June 2026, WISTA Germany elected a new executive board. Five of the seven board positions were filled by new members. These included the position of President, to which Carolyn Köhler (Bernhard Schulte Shipmanagement) was elected as the successor to Cathrin Prikker (Top Glory Marine Service).

read more
New BLG site at Südhafen ‘Roter Sand’ inaugurated

New BLG site at Südhafen ‘Roter Sand’ inaugurated

BREMERHAVEN. Together with Bremen’s Senator for Economic Affairs, Ports and Transformation, Kristina Vogt, BLG CEO Matthias Magnor and Axel Krichel, member of the Executive Board and COO of the BLG Group, officially inaugurated the new BLG Südhafen “Roter Sand” site in Bremerhaven at the end of May 2026.

read more