HEFT ANFORDERN

Logo German Ports

Magazin für Häfen, Schifffahrt und Logistik

500th offshore wind turbine from Cuxhaven

11.02.2021

CUXHAVEN. In November, the 500th nacelle for an offshore wind turbine was completed at Siemens Gamesa in Cuxhaven. This marked an important milestone for the plant, which opened in 2017 and began regular operations in 2018. Cuxhaven is part of the Siemens Gamesa production network together with the rotor blade production facility in Hull (UK) and the installation port in Esbjerg (Denmark). Together with 164 other SG 8.0-167 DDs, the 500th turbine was installed in the UK’s largest offshore wind farm, Hornsea 2.

Photo Credit: Siemens Gamesa

More articles from the category Community News

Ludwig-Plate-Straße closed until 30 October

Ludwig-Plate-Straße closed until 30 October

BREMEN. From 21 September, the level crossing on Ludwig-Plate-Straße will undergo extensive renovation. The works are expected to last until 30 October. During this period, Ludwig-Plate-Straße will be closed to private motorised traffic in the vicinity of the level crossing.

read more
Ludwig-Plate-Straße closed until 30 October

Ludwig-Plate-Straße closed until 30 October

BREMEN. From 21 September, the level crossing on Ludwig-Plate-Straße will undergo extensive renovation. The works are expected to last until 30 October. During this period, Ludwig-Plate-Straße will be closed to private motorised traffic in the vicinity of the level crossing.

read more
ZDS calls for reason and proportionality

ZDS calls for reason and proportionality

HAMBURG In light of the ballot launched by ver.di on indefinite strikes in German seaports, the Zentralverband der deutschen Seehafenbetriebe (ZDS) called for reason and proportionality on 17 September.

read more
Logo German Ports

Kontakt

Barrierefreiheit

Impressum

Datenschutzerklärung

Home

Logo German Ports
Home
Datenschutzerklärung
Impressum
Barrierefreiheit
Kontakt

2026