REQUEST THE MAGAZINE

Magazine for ports, shipping and logistics

More than 13 million euros for Brake

BRAKE. In March, NPorts gave a preview of its plans for the Brake location in the coming year. The port company has earmarked approximately 8.4 million euros for investments and 4.9 million euros for maintenance to uphold and develop the infrastructure there in 2021. The most important measures include, among others, renovation of the large ship berth on the south pier, maintenance and upkeep of the approximately 80-long rail network at the harbour, and dredging at the inland port around the north pier and Niedersachsenkai.

Photo: NPorts

More articles from the category News & People

Second FSRU moors on the Jadet

Second FSRU moors on the Jadet

WILHELMSHAVEN. Excelsior, the second floating storage and regasification unit (FSRU) in Wilhelmshaven, is now operating as a floating LNG import terminal.

read more
New President at WHV

New President at WHV

WILHELMSHAVEN. An era came to an end on 15 April 2025, the 40th anniversary of Wilhelmshavener Hafenwirtschafts-Vereinigung (WHV).

read more
Second FSRU moors on the Jadet

Second FSRU moors on the Jadet

WILHELMSHAVEN. Excelsior, the second floating storage and regasification unit (FSRU) in Wilhelmshaven, is now operating as a floating LNG import terminal.

read more
New President at WHV

New President at WHV

WILHELMSHAVEN. An era came to an end on 15 April 2025, the 40th anniversary of Wilhelmshavener Hafenwirtschafts-Vereinigung (WHV).

read more