HOLZWICKEDE. According to its own statement, the Rhenus Group is setting an important milestone in sustainable logistics for the wind energy industry with the construction of the “Rhenus Berlin 1” barge. The barge, which is expected to be completed during the course of this year, was designed specifically in response to Enercon’s requirements for transporting the latest generation of rotor blades and enables the transportation of projects to be shifted from the road to waterway. Both partners stated that it consists of a push boat and barge, the latter comprising three parts.
Credits: Rhenus/ENERCON