REQUEST THE MAGAZINE

Logo German Ports
Magazine for ports, shipping and logistics

Successful collaboration for E-Ship 1

03.02.2025
AURICH/LEER. Since November, Enercon has been working closely with the EMS Chartering shipping company based in Leer to load its multipurpose vessel E-Ship 1. According to the wind turbine manufacturer based in Aurich, this partnership increases the presence of the cargo ship fitted with rotor sails on the charter market and thus boosts capacity utilisation. Besides wind turbine components, E-Ship 1 also transports break-bulk cargo of all kinds. The three-deck freighter features 3,600 square metres of cargo space below deck and is equipped with two cranes.

Credits: EMS

More articles from the category Community News

Dirks Group expands Emden Industrial Park

Dirks Group expands Emden Industrial Park

EMDEN. The Dirks Group is expanding its space for logistics projects at the Emden Industrial Park. According to the contract logistics provider, which has been operating there since 2005, it now has a total of 90,000 square metres of warehouse space on the site.

read more
NPorts presents new sustainability report

NPorts presents new sustainability report

OLDENBURG. In July 2026, NPorts published its 2026 sustainability report. This report documents developments from 2022 to 2024 and, using specific projects and comprehensive key performance indicators, illustrates how sustainability is being implemented in Lower Saxony’s ports.

read more
Dirks Group expands Emden Industrial Park

Dirks Group expands Emden Industrial Park

EMDEN. The Dirks Group is expanding its space for logistics projects at the Emden Industrial Park. According to the contract logistics provider, which has been operating there since 2005, it now has a total of 90,000 square metres of warehouse space on the site.

read more
NPorts presents new sustainability report

NPorts presents new sustainability report

OLDENBURG. In July 2026, NPorts published its 2026 sustainability report. This report documents developments from 2022 to 2024 and, using specific projects and comprehensive key performance indicators, illustrates how sustainability is being implemented in Lower Saxony’s ports.

read more
Cross-site collaboration on new dolphins

Cross-site collaboration on new dolphins

NORDERNEY / NORDDEICH. After six of the eight groups of wooden dolphins on the heavy-duty ramp at Norderney had reached the end of their service life, NPorts replaced them in July 2026 with eight freestanding steel-tube dolphins fitted with doughnut fenders.

read more